Semi Mobile System

 

The DC 5900/5800c can be docked to a temporary or permanent tubing system installed in the work area. With a branch pipe package like below (item 3353), a temporary pipeline can be built in a stairwell or in a shakt. Several branch pipe packages can be connected in series or in branches. 

This picture shows the concept of the system.